Ivans Construction LLC

000

Mid-Valley · CO

Redstone

CO · Mid-Valley

Cabin and historic-home carpentry, decks, and siding repairs along the Crystal River in Redstone.

(970) 401-1827
Back to All Locations
Historic and cabin carpentry
Heavy snow-load decks and roofs
Siding and rot repair after hard winters
Free on-site estimates

Redstone is a historic coal-camp village on the Crystal River, and its cottages, cabins, and lodge-era homes need a carpenter who respects old construction while making it sound. We match trim profiles, rebuild porches and decks, and repair siding and framing damaged by decades of heavy snow.

Redstone gets more snow than the main valley, so structures here are sized accordingly: deeper footings, heavier beams, and roofs and decks designed for the load. We build with that in mind, not with a sea-level rulebook.

It's a longer drive from Basalt, but we schedule Redstone projects in full-day blocks so the work moves efficiently and you're not paying for windshield time.

Areas We Serve in Redstone

Redstone Boulevard
Crystal River Valley
Marble

Planning a Project in Redstone?

Get a free, no-pressure estimate from Ivans Construction LLC — and $500 off for new clients.

(970) 401-1827