Ivans Construction LLC

000

Upper Arkansas Valley · CO

Twin Lakes

CO · Upper Arkansas Valley

Cabin carpentry, decks, remodels, and repairs for Twin Lakes homes at the foot of Independence Pass.

(970) 401-1827
Back to All Locations
Cabin and mountain-home carpentry
Decks and structures sized for extreme snow
Seasonal openings and winterization repairs
Free on-site estimates

Twin Lakes sits at 9,200 feet at the base of Independence Pass, and homes here live harder than anywhere else we work: deeper snow, longer winters, and a short building season. We build and repair decks, stairs, railings, and interiors with that reality in mind, from cabin remodels to punch lists before the season opens.

Many Twin Lakes properties are seasonal, which means winter damage shows up in spring: heaved posts, split trim, frozen plumbing lines, and decks that shifted under the load. We schedule assessment trips as soon as the pass opens so repairs can start with the season.

Twin Lakes is about 40 minutes from Basalt over Independence Pass in summer. We book projects in multi-day blocks with materials staged on site, so the schedule and price stay as tight as our work in the valley.

Areas We Serve in Twin Lakes

Twin Lakes Village
Lakeview
Interlaken

Planning a Project in Twin Lakes?

Get a free, no-pressure estimate from Ivans Construction LLC — and $500 off for new clients.

(970) 401-1827