Ivans Construction LLC

000

Framing
Professional Service

Framing

Structural framing for new homes, additions, and remodels: square, plumb, and inspection-ready

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on framing

Everything else in a house depends on the frame. Ivans Construction frames new homes, additions, garages, and remodel openings across the Roaring Fork Valley, working from your plans and engineer's specs to deliver walls, floors, and roofs that are straight, square, and ready for the inspector. We frame for mountain conditions: heavier snow-load roof systems, correct hold-downs and shear, and layouts that leave the trades behind us a clean, predictable job. Builders hire us as their framing sub because we show up with a full crew and hit the schedule; homeowners hire us because we explain what we're building and why.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • New-home, addition, and garage framing from architect and engineer plans
  • Snow-load roof framing, trusses, and structural beams set correctly
  • Bearing-wall removal and header installation for open-plan remodels
  • Rough openings, blocking, and backing laid out for the trades that follow
  • Sheathing, house wrap, and window and door installation
  • Subcontract framing crews for general contractors valley-wide
Our Process

Four steps from first call to final walkthrough

01

Plans & Site Check

We review your plans and engineering, walk the site or foundation, and flag anything that will affect layout, lumber, or schedule.

02

Written Scope

An itemized estimate with lumber package, hardware, labor, and a framing schedule tied to your inspection milestones.

03

Frame & Sheathe

Floors, walls, and roof go up in sequence with the owner on site, then sheathing, wrap, and openings.

04

Inspection & Handoff

We walk the frame with you and the inspector, correct any punch items, and leave a clean deck for the next trade.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for framing

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship