
Siding
Fiber cement, wood, and engineered siding installed to shed snow and stand up to high-altitude sun
A premium take on siding
Siding in the Roaring Fork Valley takes a beating: intense UV at 7,000 feet, freeze-thaw cycles all winter, and snow piled against the bottom courses for months. We install fiber cement, cedar, engineered wood, and board-and-batten systems the way the manufacturer and the climate demand, with house wrap, flashing, rainscreen gaps, and clearances done right. New construction, full replacement, or repairs after a hard winter, on homes from Aspen to Rifle.
This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.
Every project covers the essentials
- Fiber cement, cedar, engineered wood, and board-and-batten
- House wrap, flashing, and rainscreen detailing for snow and freeze-thaw
- Soffit, fascia, corner boards, and trim included
- Full replacement, new construction, and storm or rot repairs
- Clearances and kick-out flashing that keep water out of the wall
- Subcontract siding crews for valley builders
Four steps from first call to final walkthrough
Inspection
We check the existing wall, sheathing, and flashing, and flag rot or water damage before it hides behind new siding.
Written Scope
Materials, trim package, flashing details, and schedule, itemized in writing.
Wrap & Install
Wrap, flash, and set the siding and trim course by course with correct fastening and clearances.
Walkthrough
We inspect every joint, corner, and penetration with you before the final invoice.
The difference a careful job makes
Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.
Polished Finish
A clean, professional result that elevates the look and feel of the space.
Built to Last
Careful preparation and quality materials help the result hold up over time.
Detail-Driven
We sweat the edges, transitions, and finish work that cheaper jobs skip.
Respect for Time
Clear timelines and steady communication from first contact to walkthrough.
Detail-driven from start to finish
Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.
Clear Communication
Straightforward answers, transparent scope, no surprises.
Careful Preparation
Surfaces, materials, and the site are prepped before any real work begins.
Professional Materials
We work with materials chosen for the finish and longevity they deliver.
Respect for Property
Floors, fixtures, and surroundings are protected throughout the project.
Final Quality Check
Every job ends with a walkthrough so the result matches expectations.
Questions, answered
Related services

Framing
Structural framing for new homes, additions, and remodels: square, plumb, and inspection-ready
Learn more about Framing
Flooring
Hardwood, engineered, luxury vinyl plank, laminate, and tile installed flat, tight, and quiet
Learn more about Flooring
Finish Carpentry
Trim, doors, stairs, cabinets, and built-ins with the tight joints people notice
Learn more about Finish CarpentryGet a free estimate for siding
Share a few details about your project and we'll get back to you with clear next steps.
