Ivans Construction LLC

000

Decks & Patios
Professional Service

Decks & Patios

Decks, covered patios, and outdoor living built for snow loads and mountain summers

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on decks & patios

A deck in the Roaring Fork Valley has to carry a winter's worth of snow and then look good for a summer of dinners outside. We build decks, covered patios, and outdoor living spaces with properly sized footings, beams, and joists, code-compliant railings, and decking that handles UV and freeze-thaw, whether you choose composite, cedar, or hardwood. Ledger flashing and post bases are done right so the deck outlasts the house wrap behind it. New builds, replacements, and repairs to decks that have seen too many winters.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • Composite, cedar, and hardwood decking with hidden or face fastening
  • Footings, beams, and joists sized for valley snow loads
  • Covered patios, roof extensions, and outdoor kitchens framing
  • Code-compliant railings, stairs, and lighting-ready posts
  • Ledger flashing and post bases detailed to keep water out
  • Deck repair, resurfacing, and railing replacement
Our Process

Four steps from first call to final walkthrough

01

Site Visit & Design

We measure, check grades and the house connection, and talk through size, materials, and how you'll actually use the space.

02

Written Scope

Materials, hardware, footings, railings, and schedule itemized in writing.

03

Build

Footings and structure first, then decking, railings, and stairs, with the owner on site.

04

Walkthrough

We check every fastener, rail, and stair with you before the final invoice.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for decks & patios

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship