Ivans Construction LLC

000

Demolition
Professional Service

Demolition

Selective interior demolition and tear-outs done safely, cleanly, and ready for the rebuild

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on demolition

Good demolition is precise, not just fast. We take out kitchens, bathrooms, walls, flooring, decks, fences, and sheds while protecting the structure and finishes that stay, capping utilities, and separating debris for disposal and recycling. Because we're also the crew that frames, hangs drywall, and finishes, we demo with the rebuild in mind, leaving square openings, sound subfloors, and a site the next phase can start on immediately. Dust containment and daily haul-off on every occupied home.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • Selective interior demolition for kitchens, baths, and remodels
  • Non-bearing and bearing-wall removal with temporary shoring
  • Flooring, tile, cabinet, and fixture tear-outs
  • Deck, fence, pergola, and shed removal
  • Debris sorting, haul-off, and disposal included
  • Dust barriers and protection for finishes that stay
Our Process

Four steps from first call to final walkthrough

01

Walkthrough

We mark what goes and what stays, check for bearing walls and utilities, and plan protection and access.

02

Written Scope

Scope, disposal, protection, and schedule in writing before anything comes down.

03

Demo & Haul

Controlled tear-out with shoring where needed, debris sorted and hauled daily.

04

Ready for Rebuild

We leave clean, square, swept conditions and confirm next steps with you.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for demolition

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship