Ivans Construction LLC

000

Drywall
Professional Service

Drywall

Hanging, taping, and finishing from patch repairs to full-house Level 5

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on drywall

Drywall is the surface everything else is judged against. We hang, tape, and finish drywall for new construction, additions, remodels, and basements, from a Level 4 finish for textured walls to a true Level 5 skim for the smooth, high-end look common in Aspen and Snowmass homes. We also handle repairs: water damage, cracked corners, settling seams, and the patches left behind by plumbers and electricians, blended so you can't find them after paint. Clean cuts, tight screws, and dust control on occupied homes.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • Hanging, taping, and finishing for new builds and remodels
  • Level 4 and Level 5 smooth finishes
  • Knockdown, orange peel, and skip-trowel textures to match existing
  • Water-damage, crack, and patch repairs blended invisibly
  • Moisture-resistant board for baths and basements
  • Dust containment and daily cleanup
Our Process

Four steps from first call to final walkthrough

01

Assessment

We check framing, insulation, and existing surfaces, and confirm the finish level and texture you want.

02

Written Scope

Board count, finish level, texture, and schedule itemized in writing.

03

Hang, Tape, Finish

Board hung tight, seams taped and coated, then sanded to the agreed finish level.

04

Light Check

We inspect every wall under raking light with you before it's primed.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for drywall

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship