Ivans Construction LLC

000

Fences
Professional Service

Fences

Wood privacy, ranch-style, and custom fencing set to survive frost heave and wind

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on fences

Fences fail at the posts, and in the valley that means frost heave, wind, and wet spring soil. We set posts deep, in the right footing for your ground, and build wood privacy fences, horizontal-slat modern fences, ranch and split-rail fencing, and gates that still swing true after a few winters. We'll check property lines and HOA or design-review rules with you before the first hole is dug, and match existing fencing where a repair or extension makes more sense than a rebuild.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • Cedar privacy, horizontal-slat, picket, and ranch-style fencing
  • Posts set below frost depth with drainage-minded footings
  • Custom gates, hardware, and driveway entries
  • HOA and design-review-friendly styles for Aspen and Snowmass
  • Fence repair, post replacement, and section matching
  • Staining and sealing to protect against high-altitude UV
Our Process

Four steps from first call to final walkthrough

01

Layout

We walk the line, confirm property boundaries and rules, and settle on height, style, and gate locations.

02

Written Scope

Linear footage, posts, materials, gates, and schedule in writing.

03

Set & Build

Posts set and cured, then rails, boards, and gates installed straight and level.

04

Walkthrough

Every gate swung and every panel checked with you before we leave.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for fences

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship