Ivans Construction LLC

000

Pergolas
Professional Service

Pergolas

Pergolas, shade structures, and covered outdoor rooms in cedar, timber, or steel-and-wood

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on pergolas

High-altitude sun is intense, and a pergola is the difference between a patio you look at and a patio you sit on. We design and build freestanding and attached pergolas, shade structures, and covered outdoor rooms in cedar, rough-sawn timber, or steel-and-wood combinations, engineered for wind and snow so they don't need to come down every fall. Footings, post bases, beams, and rafters are sized and fastened properly, and the joinery is clean enough to be the feature of the yard.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • Freestanding and house-attached pergolas and shade structures
  • Cedar, rough-sawn timber, and steel-and-wood designs
  • Footings and connections rated for valley wind and snow
  • Polycarbonate, metal, or slatted roof options for real shade or shelter
  • Integrated lighting, fan, and string-light backing
  • Staining and sealing for high-altitude UV
Our Process

Four steps from first call to final walkthrough

01

Design

We look at the site, sun angles, and how you use the space, then sketch a size and style that fits the house.

02

Written Scope

Materials, footings, hardware, roofing option, and schedule in writing.

03

Build

Footings first, then posts, beams, rafters, and roofing set with the owner on site.

04

Walkthrough

Connections, finish, and lighting backing checked with you before the final invoice.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for pergolas

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship