Ivans Construction LLC

000

Remodeling & Renovations
Professional Service

Remodeling & Renovations

Kitchens, baths, basements, and whole-home updates with one accountable crew

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship
Overview

A premium take on remodeling & renovations

Most valley homes were built decades ago for a different way of living. We open up floor plans, rebuild kitchens and bathrooms, finish basements, and refresh tired interiors, handling the demolition, framing, drywall, flooring, and finish carpentry ourselves so the schedule doesn't stall between trades. You get a written scope with a start and finish date, the owner on site every day, and a house that's protected and cleaned up while you live in it. From a single bathroom to a full-floor renovation, Aspen to Rifle.

This service is a good fit for homeowners and property managers who want a clean, professional result without juggling the details themselves. We handle the prep, the finish work, and the cleanup so the space is ready to enjoy when we're done.

What's Included

Every project covers the essentials

  • Kitchen and bathroom remodels from layout to finish
  • Bearing-wall removal and open-concept conversions
  • Basement finishing and bonus-room buildouts
  • Demolition, framing, drywall, flooring, and trim by one crew
  • Dust containment and daily cleanup on occupied homes
  • Coordination with licensed plumbers and electricians as needed
Our Process

Four steps from first call to final walkthrough

01

Consultation

We walk the space, listen to what you want changed, and flag anything structural or code-related that will affect scope.

02

Written Scope

An itemized estimate with materials, labor, and a real timeline, good for 30 days.

03

The Build

Demo, structure, surfaces, and finish work sequenced tightly so the space is out of action as briefly as possible.

04

Walkthrough

Every room and detail checked with you before the final invoice.

Why It Matters

The difference a careful job makes

Small choices in prep, materials, and finish work add up to a result that looks better and lasts longer.

Polished Finish

A clean, professional result that elevates the look and feel of the space.

Built to Last

Careful preparation and quality materials help the result hold up over time.

Detail-Driven

We sweat the edges, transitions, and finish work that cheaper jobs skip.

Respect for Time

Clear timelines and steady communication from first contact to walkthrough.

Our Standard

Detail-driven from start to finish

Premium results come from disciplined habits — not shortcuts. Here's the standard we hold ourselves to on every project.

Clear Communication

Straightforward answers, transparent scope, no surprises.

Careful Preparation

Surfaces, materials, and the site are prepped before any real work begins.

Professional Materials

We work with materials chosen for the finish and longevity they deliver.

Respect for Property

Floors, fixtures, and surroundings are protected throughout the project.

Final Quality Check

Every job ends with a walkthrough so the result matches expectations.

FAQ

Questions, answered

Timelines depend on the size and scope of the project. After a quick conversation about your space, we'll share a realistic estimate before any work starts.

Yes — every project starts with a free, no-pressure estimate so you know exactly what's included before deciding to move forward.

Careful prep is part of the work. We protect surrounding surfaces, prepare the work area, and stage materials so the project runs cleanly start to finish.

Absolutely. We're happy to walk through options that fit the look you want and the way the space is actually used day-to-day.

Yes. Cleanup and a final walkthrough are part of every job — the space should feel finished, not unfinished.

We serve the Roaring Fork Valley and I-70 corridor: Aspen, Snowmass, Basalt, El Jebel, Carbondale, Redstone, Glenwood Springs, New Castle, Silt, Rifle, and Gypsum. Not sure about your address? Just ask when you request your estimate.
Ready When You Are

Get a free estimate for remodeling & renovations

Share a few details about your project and we'll get back to you with clear next steps.

(970) 401-1827
Free Estimates
Local Service
Quality Workmanship